一本一道色欲综合网中文字幕丨狠狠色综合网丁香五月丨再深点灬舒服灬太大了网站丨欧美性黑人极品hd丨亚洲精品无码久久久久不卡

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.vhbaby.com

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 亚洲成av人在线视| 国产男小鲜肉同志免费| 5d肉蒲团之性战奶水| 熟妇人妻av无码一区二区三区| 四虎影视精品永久在线观看| 好吊射视频988gaocom| 国产在线永久视频| 少妇特黄a一区二区三区 | 欧美va亚洲va在线观看| 天堂在/线资源中文在线| 末发育女av片一区二区| 中文无码日韩欧av影视| 日韩人妻无码精品久久久不卡| 久久久久久国产精品免费免费男同 | 国产寡妇偷人在线观看| 少妇被又大又粗猛烈进出视频| 亚洲国产一区二区a毛片| 在线播放五十路熟妇| 亚洲精品尤物av在线观看不卡| 国产av成人无码精品网站| 精品久久久无码中文字幕| 老鸭窝视频在线观看| 日本道精品一区二区三区| 国产成人精品日本亚洲语音 | 国内精品国产成人国产三级| 国产99久9在线视频 | 传媒| 高清无码爆乳潮喷在线观看| 成人性生交大片免费看中文| 高潮内射免费看片| 日本午夜免a费看大片中文4| 毛片无遮挡高清免费| 久久亚洲私人国产精品| 日本熟妇色高清免费视频| 国产av综合第一页| 国产白嫩美女在线观看| 日韩av无码成人无码免费| 国产成人无码av大片大片在线观看| 日产精品久久久久久久性色| 精品久久久久久综合日本| 久久天天躁夜夜躁狠狠85| 成年入口无限观看免费完整大片|